offers a wide range of services, which have been successfully applied
in many industrial projects. Some of the services below are the
result of studies, which may be found at the end of this list.
Activities
|
| |
For
some of the services listed below descriptions are available upon
request:
- Project
Management // PM //
- Safety
and Security Management, Reliability Engineering // SAF //
- Quality
Management // QM //
- Training
Management // TRA //
- Configuration
Management // CM //
- Test Management
// V&V //
- EV - Earned
Value (quantitative progress analysis) // PM //
- Project
Status Audits // PM //
- BICO (Benchmarking
and ISO
9001:2000 Combined) // PICO
(Process Improvement Combined
Approach) // CON // STUDY //
- Proposal
(Tender) Management and Evaluation // TEN //
- Customer
Satisfaction Surveys // QM //
- ISO 9000
Consultancy // QM //
- System
Development and Deployment // DEV //
- Studies
// STUDY //
- SES Regulations
// SES //
|
TOP
Experience
| |
Pre-APAC
Experience of Key Staff
Before
was founded in 1994 Mr Scherzer was head of a department of the Austrian
Aerospace Company (ORS) with the responsibility for
- ESA/ESTEC
SW-development projects
- ESA/ESTEC
safety and reliability management related projects
- ESA/ESTEC
quality management related projects including standards update
- industrial
SW-development projects
- IT infrastructure
including CAE environment and mainframes
Ms Lanzerstorfer
and Ms Breuer belonged to Mr Scherzer's department and share his
rich experience in safety-related space projects.
At the Austrian Aerospace Company Ms Lanzerstorfer was responsible
for the management and development of applications for several platforms.
Ms Breuer was responsible for the adoption of ESA PSS-0-5 and related
standards for internal use at Austrian Aerospace Company. She was
also responsible for the implementation of an ISO 9001:2000-conform quality
management system that was successfully certified in 1993.
Aerospace
- ESA/ESTEC
SAFIS // PM // SAF //
performed the project and technical management of the development
of SAFIS; project team: ESTEC, Austrian Aerospace, Intecs, Austrian
Aerospace, ERNO, IberEspacio.
performed the project and technical management of the data collection
and compilation for SAFIS; involved organisations: ESTEC, CNES,
SAS, Delta, Intecs, Austrian Aerospace Company, ERNO, IberEspacio.
PSS-Update
// STUDY // CON //
performed studies on standards and provided the definitions of standards
(PSS-series) for the aerospace business (European Space Agency,
ESA); e.g. ESA PSS-Update (prime contractor: Intecs/Italy) which
led to the update of the relevant ESA standards in the fields of
Software Safety and Reliability. |
TOP
Industrial
Projects
| |
________________________________________________
BMVBS – REFERAT LR 21 (GERMAN National Supervisory Authority)
| |
Audit of DWD (German MET Provider)
//
SES //
has been contracted by the NSA to assess the German MET Provider for compliancy with the applicable Common Requirements and to make a recommendation for certification.
|
Industrial
Projects
________________________________________________
BMVBS – REFERAT LR 23 (GERMAN National Supervisory Authority)
| |
Audit of Black Forest Airport Lahr
//
SES //
was contracted by the NSA to assess the Black Forest Airport Lahr Air Navigation Service Provider for compliance with the applicable Common Requirements and to make a recommendation for certification.
|
Industrial
Projects
________________________________________________
KZPS (Kontrola zracnega prometa Slovenije) - Slovenia Air Traffic Control
| |
Technical Programme Management for Migration to new ATCC
// PM // QM // CM // TENDER // V&V //
Slovenia Control will renew the
existing ATM system and move to a new ACC location at the airport in Brnik. The migration will be performed in several steps and,
simultaneously, a substantial system upgrade will be performed. The currently used trackers, FDPS, HMI and VCS will be replaced.
To reduce the risk it is planned to install and integrate the new systems already at the old location and deploy the new system at
the new location. was contracted for the technical
migration programme management for the migration to the new location. The programme management responsibility includes guiding
and managing the technical project managers, moderating the steering groups, preparing and reviewing the calls for tender, initiating
and controlling the activities and, last but not least, managing the project office.
Safety Assessment for new ATCC
// SAF //
Slovenia Control will relocate the ATCC close to the Brnik airport. During this relocation several systems will be
replaced including ASD/RDD, FDPS, SDPS.
was contracted to perform the safety management for the complete technical relocation of the ATCC to the new location.
This task includes the support of the system suppliers for ESARR 4/6-compliant software safety management, review of the
suppliers’ safety deliverables and the creation of the ATM system safety case as a basis for the certification by the National
Supervisory Authority.
Definition and Implementation of a Safety Management System
// SAF //
was contracted by Slovenia Control to develop a safety
management manual describing the related processes compliant with the requirements defined by the EC Regulation 2096/2005
(Common Requirements). also provided support for the
implementation of these processes.
|
Industrial
Projects
________________________________________________
________________________________________________
DFS
Projects (Deutsche Flugsicherung GmbH) - German Air Traffic Control
| |
ANDRA
// QM // CM // TENDER //
is responsible for the quality management and the configuration
management in the ANDRA project (Advanced Node for Data Relay
in the ATN). In addition,
has defined the project-specific standard for the evaluation
of the tenders and has supported DFS in the assessment of
the suppliers’ process capabilities. The ANDRA project
will improve reliability and performance of the air traffic
control data transfer system by means of implementing state-of-the-art
technology. 's
tasks also include supporting and fine-tuning of the requirements
in the management process.
Integrated
Tower System // QM // PM //
was responsible for the quality management and for the support
of the project management by the implementation of project
management tools in the project ITS (Integrated Tower System).
The main project goals were to build a new system that is
scaleable and adaptable to all 17 towers in Germany and to
reduce the “system diversity” of the “DFS
Platzkontrollstelle“. The newly developed or adapted
software components for the air traffic control operations
should use the same HMI software. By adhering to CORBA, DFS
aims to allow for the development and deployment of distributed
object systems in heterogeneous environments.
SVS-D
Tower // QM // PM //
SVS-D Tower is an Air Traffic Communication System designed
to be used in several towers in Germany. ''s
consulting services for this project included support during
the project initialisation phase. Additionally, we monitored
the status of the project on a regular basis by calculating
the earned value of the project and by performing status audits
during which the progress of the project and conformity with
the project plans were verified.
Safety
and Security Analysis as well as Tracing of the Implementation
in the ANDRA Project // SAF //
The ANDRA system requirements were analysed as specified in
the DFS internal standard "Sicherheitsanforderungen an
flugsicherungstechnische Systeme", "IT-Sicherheitshandbuch,
BSI 7105" and taking into account other state-of-the-art
standards. On the basis of the results of this analysis, the
IT-Safety and Security Concept for the development and operation
of the ANDRA system, which complies with the internal DFS
standards and the BSI 7105 (applicable for the selection and
implementation of security measures), was developed.
reviews the suppliers’ products and traces the safety
and IT security-related activities during the implementation
and deployment of ANDRA.
VAN
2. Release // QM //
supported this project by putting its knowledge in quality
management for projects into practice. The project VAN 2 Release
had a duration of two years and ensured that the system is
able to operate properly beyond the year 2000. Additionally,
the system performance and switching performance was improved
by the implementation of new hardware and a new database concept.
Update
Project Management Handbook // PM // CON //
The tasks of defining the topics of project reporting and
project structuring have been assigned to .
These inputs were used for the DFS-wide "Project Management
Handbook".
SIA
// QM //
The major task of the former IA department is the management
of the on-site installation of air traffic equipment in towers.
The goal is to provide the users with turnkey solutions.
was assigned to oversee the quality management at several
sites.
SIP
// CON // CM //
The former SIP Department was responsible for making sure
that the air traffic management products to be installed at
DFS towers meet the requirements of the users. This included
the management of the implementation of the necessary updates.
was assigned to analyse the processes and to support the definition
of the configuration management processes.
IDPS
(Information Data Processing System) // QM // PM //
The main goal of the project is to install the IDPS system
according to its operational and technical requirements (the
IDPS is a sub-system of the DFS-ITS tower system for which
the requirements are maintained in the DFS-ITS requirements
data base). The DFS intends to procure an IDP system which
can be integrated in an ITS system.
In this projec
has been assigned the task of supporting the project management
with regular progress reports and Quality Management activities.
TFDPS
(Tower Flight Data Processing System) // PM // QM // CM
//
The goal of the project is the gradual implementation of an
ITS TFDPS component and the related ACC/APP-Tower-Interface
for the future P1-Environment based on an NDI product.
supported the project, quality and configuration management
processes within the DFS project team.
Audit
of the HMI Pathfinding // QM // CON //
The DFS contracted
for auditing a sub-project of the project VAFORIT (Very Advanced
Flight Data Processing Operational Requirements Implementation).
The results have triggered organisational and process improvement
measures.
ARTE
(Automatic Radardata Transmission Equipment)
// QM // CM //
has been assigned to oversee the quality management and to
support the project and configuration management activities
in the project ARTE. The project took about four years. The
ARTE system provides an alternative source of radar data within
5 seconds in case of a node failure.
Audit
of the Branch Telecommunication and ATC Center for ISO
9001:2000 conformance //QM //
performed an on-site audit to identify the necessary improvement
measure to meet the ISO
9001:2000 requirements. The scope also
included operational maintenance of ATC equipment. The report
formed the basis of the improvement measures to be implemented
for the ISO 9001:2000
certification.
RMCDE
Audit and Risk Evaluation // CON // QM //
RMCDE (Radar Message Conversion and Distribution Equipment)
provides critical information for the operation of air traffic
control. It was 's
mission to evaluate the implemented processes and the documentation
to provide recommendations for higher reliability and availability
of service. The supplier and Eurocontrol were also visited
during the evaluation.
was supported by the DFS quality assurance department.
Support
of the Telecommunication Unit and the ATC Centre for ISO
9001:2000 Conformance // CON // QM //
supported this unit of DFS during the implementation of a
process oriented Quality Management System conforming with
ISO 9001:2000.
created and reviewed process descriptions and quality system
related documents.
Support
of the Tower and Center Unit for ISO ISO
9001:2000 Conformance
// CON // QM //
has been assigned to support these two DFS units during the
implementation of a process oriented Quality Management System
conforming with ISO
9001:2000.
created and reviewed process descriptions and quality system
related documents.
also moderated quality related workshops.
MUBANET
(Multiplexer Basic Network) // QM // CM //
has been assigned to oversee the quality management and to
support project and configuration management activities in
the project MUBANET. The project had a duration of about three
years. During the project the multiplexer systems were procured
and integrated in the telecommunication infrastructure of
the DFS.
Configuration
and Change Management Process Audit of Tower Leipzig and Hannover
// CON // QM//
performed on-site audits to identify non-conformances with
standards by the defined configuration and change management
process. The audits covered all systems and the entire infrastructure
available in the Tower.
CMMC-FM (Common Maintenance Monitoring and Control – Facility Management)
// CM // QM//
has been assigned to oversee the quality and configuration management and to support the project management activities in the project CMMC-FM. The project duration will be about four years. The project goals are the provision and indication of status information of the facility management systems as well as the development and realisation of an FM service centre in an Service Management Centre for a central monitoring of the relevant facility management systems of all operationally used DFS objects (CC, Tower, CNS).
|
Industrial
Projects
________________________________________________
Austrocontrol
(ACG) - Austrian Air Traffic Control
| |
Quality Gate for FAB CE TEN-T Project
// CM // QM //
The FAB CE project received funding from the
EUROPEAN COMMISSION via the TEN-T Agency. Austrocontrol is the leader of this project and has contracted
to act as
quality gate vis-à-vis the TEN-T Agency.
Improvement
of the Tender Process
// TEN // CON //
A
method for the evaluation of tenders has been defined. Tenders
have been evaluated according to these methods.
Approach
Project (APP, Voice Communication System) // QM //
was assigned to support the ACG in the transition phase for
overseeing the quality management tasks and status reporting
on a regular basis.
AUSTRAS
- ACC Simulator // PM // QM // CM //
Initially
was assigned the task of auditing, of carrying out quality
management and configuration management and of supporting
the subcontractor management for the extension of the existing
simulator system. Later on
also took over the responsibility for the project management.
SAFMAN
// SAF // CON //
was assigned a leading role in the definition and implementation
of effective and efficient organisation, methods and processes
for safety management at ACG in accordance with the EATCHIP
Safety Policy. 's
activities included the creation of the safety manual that
included all ACG safety management issues (organisation,
training, procedures, auditing).
|
Industrial
Projects
________________________________________________
CAPS
(CEATS AMS PROVIDER SUPPORT) // QM //
| |
is responsible for the quality check of each deliverable before
it is forwarded to ACG for delivery to EUROCONTROL. |
Industrial
Projects
________________________________________________
EUROCONTROL
| |
EATMP- CEEC
(Central and Eastern
European Cooperation) - EATMP Framework
//PM //
is the consortium leader of CEEC (Central and Eastern European
Cooperation) - a consortium that successfully submitted a
successful bid for the EATMP Framework.
Nine companies in four countries founded a consortium to offer
SW development, safety, operational and management services
in the ATM environment.
EEC-CEEC
(Central and Eastern European Cooperation) - EATMP Framework // PM //
is the consortium leader of CEEC (Central and Eastern European
Cooperation) - a consortium that submitted a successful bid
for the CEE Framework.
Eleven companies in six countries founded a consortium to
offer research expertise for Sector Safety and Productivity,
Network Capacity and Demand Management, Airport Throughput,
Innovative Research and Society-Environment-Economics in the
ATM environment.
Evaluation
of the EATM Safety Assessment Methodology as a means of
compliance with ESARR 4
// SAF // STUDY //
EATM Safety Assessment Methodology is a harmonised set of
working practices for Air Navigation Service Providers to
assess the safety of the proposed changes to their systems.
has
been contracted to evaluate the EATM Safety Assessment
Methodology as a means of compliance to ESARR 4.
SESIS
– EUROCONTROL support for the creation of Guidance Material
for NSA and ANSP
// SES // STUDY //
EUROCONTROL
established the "SES Implementation Support" (SESIS)
project, whose scope was to assist National
Supervisory Authorities (NSAs) and Air Navigation Services
Providers (ANSPs) in the context of certification.
Accordingly, EUROCONTROL developed guidance material for NSAs
to certify ANSPs against the
Common Requirements (CRs), and for ANSPs to comply with the
CRs and be certified.
has been
contracted to support EUROCONTROL in the creation of the
guidance material.
SESIS
– EUROCONTROL support for
the creation of Guidance Material
on
Common Requirements Compliance on
Quality //
SES // QM // STUDY
//
EUROCONTROL
established the "SES Implementation Support" (SESIS)
project, whose scope was to assist National Supervisory
Authorities (NSAs) and Air Navigation Services Providers (ANSPs)
in the context of certification. Accordingly, EUROCONTROL
developed guidance material for NSAs to certify ANSPs against
the Common Requirements (CRs), and for ANSPs to comply with
the CRs and be certified.
has
been contracted to support EUROCONTROL in the creation of the
guidance material to fulfil the Common Requirements on Quality,
for example, the development of guidance material and
supporting documentation on ISO 9001:2000 certification.
Development of SeRT Course 6 Requirements “Detailed ESARR 3 Training”
// SAF // STUDY //
was contracted to develop requirements for a training programme that will enable the delegates to describe the SMS concept in depth as well as to design an ESARR 3 Implementation Plan to enforce ESARR 3 within the national safety regulatory framework and, finally, to regulate against a national rule based on ESARR 3 (including the verification of compliance with ESARR 3 requirements).
ASSIST Level 1 Support – Knowledge Management Database for SES Guidance Material
// STUDY //
has been contracted to develop a Knowledge Management Database for related SES Material (e.g. SESIS Guidance Material) by EUROCONTROL. The aim of this project is to increase the usability of the available material.
ECRA - EUROCONTROL Documents Restructuring ARTAS
// STUDY //
ARTAS is a very important safety critical surveillance data processing system widely used in ATS.
EUROCONTROL contracted a team to upgrade the ARTAS product to meet at least the SWAL 4 (recommended minimum requirement for operational ATM system) to the highest possible extent.
's role in the consortium is, among others, to assess the current system, identify the gaps and to verify the correct upgrade of the system.
Development of ESARR 3 GUI for interpretation of ESARR 3
// STUDY //
The EUROCONTROL Safety Regulatory Commission developed Safety Regulatory Requirements (ESARR 1 to ESARR 6).
To support the harmonised implementation of the ESARRs, several standards such as Acceptable Means of Compliance (AMCs)
as well as Guidance Material were developed.
was contracted to develop an ESARR 3 Guidance Document addressing
monitoring and verification of implementation of ANSP resources and Critical Incident Stress Management (
CISM), ICAO material on SMS, including inputs from workshops and SRC deliverables in local languages and Safety
Oversight of safety training, incident reporting and human factor elements.
Comparative Analysis of the Irish and Austrian CAAs and ANSPs
// STUDY // SES//
was contracted by EUROCONTROL to perform a comparative analysis
of systems in Austria, Ireland and the theoretical civil aviation system to support Cyprus with regard to the selection
and implementation support for an appropriate model for the civil aviation organisation.
CIMACT
// SAF // STUDY //
The purpose of CIMACT is to integrate civil and military air traffic data to provide the user with a comprehensive
overview of the air situation. It provides information on all basic ATC functionalities and safety nets and uses a variety of supplied
data inputs. was contracted for the safety assessment as well
as the analysis to identify the gaps of the existing system with regard to the required SWAL level identified during the safety
assessment as well as the compliance with ISO/IEC 12207.
LARA
// SAF // STUDY //
LARA is a EUROCONTROL airspace booking management system for civil/military coordination.
was contracted to carry out the preliminary safety assessment of LARA to be reusable with modifications as minimal as possible
for the ANSP’s safety cases, as well as the safety assessment of a specific implementation at an ANSP.
ESARR 5 IMPLEMENTATION COURSE
// SAF // STUDY //
was contracted by EUROCONTROL’s Institute of Air Navigation Services (IANS) to develop the ESARR 5 training course, mainly for ESARR 5 national focal points, safety regulators working
in connection with ESARR 5 (licensing staff, competency assessment staff for engineers and technical personnel, safety oversight).
SES FRAMEWORK TRAINING COURSE
// SAF // SES // STUDY //
was contracted by the Safety Regulatory Unit and
EUROCONTROL’s Institute of Air Navigation Services (IANS) to develop the SES training course. This training course is dedicated to
National Supervisory Authorities to support them in gaining the required competence to meet their requirements. The training course
will provide an introduction to the Single European Sky and will form the basis for further training.
REGULATORY SUPPORT MATERIAL FOR SAFETY OVERSIGHT WORKSHOPS
// SAF // STUDY //
was contracted by the Safety Regulatory Unit to
support the implementation of ESARR 1 and the Commission Regulations 1315/2007. This training programme is designed as a series of
workshops that will be dedicated to certain topics and will, on the one hand, provide the theoretical basis, and on the other hand,
guidance for the practical implementation.
|
Industrial
Projects
________________________________________________
EAD
Consortium Frequentis // PM // QM // CM // TRA // TEN // V&V // SAF // CON // DEV //
| |
EAD
(European Aeronautical Information Services Database)
performed project, quality, training, test and configuration
management in the EAD Programme, for an overview please go
to: http://www.eurocontrol.int/ead/
or http://www.apac.at/TeamEAD/
.
took over the management responsibility for EAD and performed
a project re-initialisation. Under ’s
management, EAD was developed in less than three years in
accordance with the planning at the project re-initialisation.
It has now been operational since 2003-06-06.
was also in charge of safety management and provided security
consulting services to the supplier. In order to do this efficiently,
a joint safety and security team /EUROCONTROL
was formed. This team developed a combined safety and security
approach providing an efficient and effective implementation
of applicable safety and security requirements.
took also over the EAD client migration management and was
contracted to manage the Pilot and Alpha Client Integration
into EAD, which included co-ordination with Eurocontrol, about
15 ANSPs, GroupEAD, CSC Copenhagen, the EAD System Supplier
and the production of SLAs, specification and development
of Client specific SW as well as managing the Client’s
integration at the IT site. Management of the implementation
of the EAD safety and security requirements at the Clients
was also a major task of this project.
|
Industrial
Projects
________________________________________________
Frequentis
GmbH
| |
Development
of Safety and Quality Specific Procedures // CON // SAF
//
Frequentis produces state-of-the-art, dependable products
for air traffic control services.
has developed company-specific procedures and standards to
meet the safety and quality requirements of the projects (in
accordance with the MIL-Standards and DoD-Standards).
Definition
of SW-Engineering Standards // CON // DEV //
was assigned by Frequentis to support the development of company-specific
SW engineering standards that offer the benefit of improving
the process and product quality. The standards and procedures
include configuration management procedures, verification
and validation procedures and software engineering standards.
Development
of a Global Resource and Project Control Model // CON
// PM //
With the help of ’s
consulting services a sound and widely accepted Global Resource
Control and Project Control Model was developed and implemented.
The model includes:
- project
standardisation
- project
planning
- company-wide
project monitoring
- company-wide
planning and controlling of human resources
- a
project metrics programme
The developed
procedures are implemented with the support of SAP R3 (Accounting
and Management Information System).
SVS-D
// PM // QM // DEV //
SVS-D is an Air Traffic Communication System ordered by Deutsche
Flugsicherung and implemented by a consortium including Frequentis
GmbH and Siemens AG.
performed the overall planning tasks and status audits on
the SVS-D project to verify the progress and to assure conformity
with the project plan. In addition,
was contracted to manage the process of the finalisation of
the documentation and to write technical documents.
SW
Development Cost Estimation // PM // QM // DEV //
The application of different software cost estimation methods
(3-D Function Point Method, COCOMO and Vollmann Method) used
in FREQUENTIS projects was analysed. The goal of the project
is the definition and implementation of a company-specific
Cost Estimation Model.
TETRA
// PM // QM //
has been responsible for central and independent co-ordination
in the joint development of TETRA of SIMOCO (England) and
FREQUENTIS. The activities included the co-ordination of the
joint planning, the tracing of progress, risk management and
monitoring of development and test activities.
ACC
// PM // QM // DEV //
Within this project
applied its knowledge of Project Management and Quality Management
to the development, installation and transition of a new voice
communication system for AUSTROCONTROL (Austrian Air Traffic
Authority) as responsible project manager.
Customer
Satisfaction Survey // QM //
was assigned the task of performing the annual customer satisfaction
evaluation for 1997 by Frequentis. Additionally, the customer
satisfaction with Frequentis projects was continuously re-evaluated
by
until 1999.
BICO
Audit/Project Status Audit // PM // QM //
performed BICO Audits and Project Status Audits on a regular
basis (about 35 audits during the last four years). This includes
audits of subcontractors and potential subcontractors.
ISO 9001:2000
Consultancy // QM // CON //
was assigned the task of supporting the implementation of
a quality management system in FREQUENTIS Bratislava, which
was already successfully certified according to the ISO 9001:2000
standard.
has also supported the preparation of the external certification
audit according to ISO 9001:2000
at FREQUENTIS Offenbach, which
was also successfully passed in the form of an audit.
Support
during the Tender Process //TEN //
The process-specific part of the tender NB3 and Terrafon was
partly compiled and verified with the support of .
Monthly
Progress Reports // PM //
was tracing the progress of several projects and provided
the management with monthly progress reports.
Evaluation
of Companies – Audits // QM // CON //
was assigned the task of evaluating the processes at several
suppliers or co-operation partner companies and to support
the improvement of the joint processes.
Safety
and RAM (Reliability, Availability, Maintainability) Support
// SAF //
was continuously assigned the task of conducting the safety
and RAM processes in many projects.
The overall objective of a system safety programme is the
reduction of potential system risks by providing a comprehensive
assessment of the system’s ability to maintain service
to its users in the event of hardware and/or software failures.
It is the goal of the RAM Programme and its activities to
assure the design of an inherently safe and effective system.
D ORIS
(Danube River Information Service)
// PM
// QM
//
Th e
concept of this information system for inland navigation
follows two major goals: The provision of the actual traffic (tactical
traffic image) as the nautical component and the online
provision of a widespread information system of all facts of
the operative inland navigation with respect to the logistics
component.
was
in charge of supporting the project management with regular
project status audits of the suppliers and during the overall
project planning and progress tracking.
M etropolitan
Police //
PM //
QM //
Fr equentis
is in charge of providing a Video and Voice Communication
System to the Metropolitan Police in London.
is continuously
assigned to perform project status audits of the suppliers and
also to support the overall project planning and progress
tracking.
EAD
IT Service Provision Setup // DEV // CON //
On behalf of the GroupEAD Europe S.L. shareholder FREQUENTIS,
was primarily responsible for managing and performing the
setup of the EAD Service Provision. This consisted of the
development/implementation of the IT related services and
procedures, which were described in the related service plans,
EAD client planning and client integration related procedures
and covered the initial EAD data load. The project was completed
ahead of time and the EAD Service Provision could therefore
be started two months earlier than scheduled. For more information
on EAD, please go to http://www.eurocontrol.int/ead/
or http://www.apac.at/TeamEAD/
.
|
Industrial
Projects
________________________________________________
ANS
CR, Austrocontrol, Slovenia Control
| |
One
Air Traffic Management System (OATMS) // PM // QM
// CM // SAF //
The One ATM System joint undertaking is a technical and commercial
initiative to renew the Czech, Slovenian and Austrian Air
Navigation Service Providers’ current ATM systems in
phases between 2007 and 2012 (http://www.1-system.org
). In its efforts, it aims to maximise
the benefits for the stakeholders, especially for the airspace
users, by minimising life-cycle costs for the system and the
services, by following the Single European Sky principles
and by striving to achieve the targets of harmonisation and
integration.
is in charge of the management of the One ATM System EWIV (EEIG), including
project, quality and configuration management.
|
Industrial
Projects
_______________________________________________
Skysoft ATM
| |
Assessment of the Development Process
//
DEV //
QM //
SAF //
was contracted by Skysoft ATM to assess the development
process for product development for conformance with EN61508 SIL2 and to support
the process improvement.
SASKI
// DEV // QM // SAF //
SkySoft has to perform a Software Safety Assessment for some of its solutions currently in operation within skyguide.
was contracted to support SkySoft with the implementation of Safety Assessment (FHA, PSSA and SSA activities) procedures
compliant with ESARR 6 by a reference implementation for “SkyVisu”. The activities include the training sessions to convey ESARR 4/6/SAM
theoretical knowledge as well as the moderation of safety assessment activities.
|
Industrial
Projects
________________________________________________
Belgocontrol
| |
ASD Product and
Development
Process Assessment //
PM //
QM //
SAF //
As
part of the Belgocontrol CANAC Upgrade project the Advanced
Situation Display (ASD) was developed by an external supplier.
was
assigned the task of evaluating the product and processes for
maintainability and compliance with requirements derived from
ESARR 4 and to propose adequate improvement measures.
AMS Product and Development Process Assessment
// PM // QM // SAF // AMS provides A-SMGCS functionality at the Brussels Tower.
was contracted by Belgocontrol to assess the associated business, operational, safety and development processes
to support the decision concerning future strategies in this area. Part of this activity was the assessment of compliancy
with SES safety requirements.
|
Industrial
Projects
________________________________________________
Others
| |
Implementation of SES compliant processes for airports
// SES // SAF//
Due to SES regulations all ANSPs (Air Navigation Service Providers)
needed to fulfil the requirements defined in the EC Regulation 2096/2005 (Common Requirements).
supported airports such as the regional airport in Mannheim and the airport Finkenwerder (Airbus/Hamburg)
in preparing for certification.
Training for the implementation of ESARR 3 compliant Safety Management Systems // SES // SAF //
The EC Regulation 2096/2005 (Common Requirements) as well as ESARR 3 require ANSPs (Air Navigation Service Providers) to implement
and maintain a safety management system. Based on the extensive experience in this area
developed a hands-on training course
to support ANSPs (Air Navigation Service Providers) that need to implement and maintain a safety management system.
|
Industrial
Projects
________________________________________________
TeleControl
| |
IV&V
// V&V //
TeleControl
assigned
as an Independent Verification and Validation Company to develop
system test plans for main modules of the UNIBET lottery system,
and to support the TeleControl internal test team with independent
V and V activities.
An additional benefit as a result of our activities in this
project was the specification of a universal test database
where test cases, test objects and the results of the performed
tests are filed and processed for further evaluation.
BICO
Audit // QM //
performed a BICO Audit on a sample project to identify areas
with potential for improvement.
|
Industrial
Projects
________________________________________________
ORS
- Austrian Aerospace Company
| |
CIPIS
// DEV // PM //
Project and Technical Management of the development of CIPIS
(Computer Integrated Project Information System) with special
emphasis on the requirements of ESA/ESTEC for planning, accounting
and reporting. A system for managing project data of many
large projects (planning, effort, costs, results) running
at different organisations and sites was implemented including
data exchange interfaces for remote sites.
Project Partners were ORS/Austria and IberEspacio/Spain.
ZSK400
// DEV //
Development of a Windows-based interface with the hardware
and database of the time-keeping system ISGUS. ZSK400 was
integrated in CIPIS.
The aim of ZSK400 is to provide the user with information
about his daily working hours, which are then assigned to
projects and automatically compiled at the end of each month.
|
Industrial
Projects
________________________________________________
Improx
| |
ISO
9001:2000 Consultancy and Project Management Support // QM
// CON //
was assigned the task of supporting the implementation of
a quality management system, which was successfully certified
according to ISO 9001:2000. On the basis of its experience in successful
project management,
also supported the implementation of a goal-driven project
management model.
|
Industrial
Projects
________________________________________________
|
TOP
Studies/Products
| |
BICO
// STUDY // QM //
Development and application of BICO (Benchmarking and ISO 9001:2000
Combined).
BICO is a life-cycle model which combines the ISO 9001:2000
requirements
with quantitative assessment methods as a sound tool that supports
the customer on the way to effective and efficient quality management.
BICO activities include the participation in a European training
programme that is supported by the Commission of the European Communities
under the LEONARDO DA VINCI Programme.
Project
Status Audit / BICO // STUDY // PM // QM //
On the basis of the BICO tools
developed a procedure for the very efficient and effective determination
of the status of a project. The data collected during an audit allows
a comparison of actual progress to planned progress. The resulting
audit report identifies the project risks and determines the progress
of the project in a quantitative way. The procedure has already
been successfully applied in the air traffic systems environment
(e.g. Frequentis, Siemens, DFS).
Project
Management Model // STUDY // PM // QM //
Based on its experience in successful project management,
developed a goal-driven project management model that minimises
risks and increases productivity. Accurate project tracking based
on the Earned Value Method allows the timely identification of potential
problem areas and the initiation of corrective actions.
was assigned the task of implementing this model in a software development
company. It was part of the contract to adapt the model to company-specific
needs, training and the management of several projects during implementation.
ISVV (Independent
Software Verification and Validation) // STUDY // V&V //
A study on the verification, validation and evaluation of software
projects by external, independent companies was conducted. This
study was funded partly by the Austrian Authorities (FFF) and supervised
by ESA/ESTEC.
IX (Independent
X-Model) // STUDY // V&V //
On the basis of a study under the supervision of ESA/ESTEC,
developed a process model for IV&V (Independent verification
and validation in accordance with the
IX-model) that can be tailored to the needs of the customer.
APoMet
// STUDY // V&V // QM //
Development of an effective metric set for small and medium -sized
companies.
SWE
// STUDY // DEV // QM //
Verification of the hypothesis “Software Engineering Pays“.
The study consists of an experimental study and of research based
on existing data and literature. In the experimental study, six
teams developed a programme starting out with the same specification
but with different requirements for the development process. The
results show the influence of appropriate software engineering methods
on the quality, the schedule, the development effort and the maintenance
effort of a software product.
PICO (Process
Improvement Combined Approach) // STUDY
// DEV // PM // QM //
The mission of PICO was to develop a set of tutorials dealing with
the different improvement approaches which can be combined to become
an overall model to transfer state-of-the-art improvement knowledge.
The project was funded partly by the Commission of the European
Communities under the LEONARDO DA VINCI Programme.
was the prime contractor and was responsible for the project management
and quality management of the multinational project.
APLET//
STUDY // DEV // PM // QM // CM //
developed a solution based on MS-Exchange to support Project Management,
Quality Management and Configuration Management.
PICO Toolset
Project Management (Process Improvement Combined
Approach) // STUDY // DEV // PM //QM //
Multi-platform data collection SW tool for safety and quality auditing
in a distributed environment with a central database to store data
of different organisations with the option that data can be compared
without disclosing their origin. Remote access via internet or dial-up
as well as a graphical visualisation of the results were also implemented.
Several interfaces to import data from other tools were implemented.
was the prime contractor, and partners involved in the development
of the tool were ISCN/Ireland, aimware/Ireland, ami/France. The
SW was developed and distributed among the partners and integrated/tested
at APAC.
ASMM
- APAC Safety Management Model // STUDY // SAF // CON //
At the end of 2004, launched an internal project with the aims
- to develop
a methodology for safety audits in cooperation with Corvinus University
Budapest (ASMM project); and
- to develop
material for common requirement audits and to obtain the authorisation
to call itself a "recognised organisation"
as defined in the Common Requirements for the Provision of Air Navigation
Services. This methodology for safety audits will include the development
of a safety maturity model.
|
TOP
|