Slovenia Control - Support, Advice and Production of Operational Documentation

Slovenia Control contracted APAC for technical and management support related to the following tasks:
Slovenia Control DPO and Ground Equipment Certification Support
- Identification, analysis, and review of the implemented Slovenia Control processes.
- Development of, and support in preparing, the DPO process documentation.
- Creation, update, review, and maintenance of software development-related documentation.
- Support in communication with the competent authority responsible for approving the DPOs.
- Preparation of documentation for ground equipment to be certified by the competent authority.
Support for Achieving CP1 and LSSIP Objectives
- Project management support.
- Support in the analysis of CP1 and LSSIP objectives, including the required functionalities and the definition of an implementation roadmap.
- Identification of regulatory requirements, and support in operational and system requirements engineering for the upgrade of FDPS, CPDLC, Radar Data Display, Monitoring Aids, Safety Nets, and SWIM-compliant meteorological data display.
- Support in safety assessments.
- Review of verification and validation activities.
- Preparation, update, and review of project and lifecycle documentation compliant with the rules for certification and declaration of ATM/ANS systems and constituents.
Support in Implementation of the New VCS
- Project management support.
- Definition of an implementation roadmap, including the transition from the old VCS to the new VCS.
- Comprehensive review of the product documentation delivered by the manufacturer.
- Support in the preparation of Slovenia Control documentation required for transition and operation.
- Participation in verification and validation activities.
- Performance of the safety assessment and production of the VCS Safety Case.
Maintenance of ATCC and TWR Safety Cases
- Review of changes to the functional systems of the ATCC and TWR units.
- Performance of safety assessments in cooperation with operational personnel and technical experts.
- Update of the ATCC and TWR Safety Cases, taking into account the safety assessment results and available evidence.
Support in Fallback FDPS Production and Delivery to EUROCONTROL MUAC
- Support in the preparation, update, and review of project and lifecycle documentation.
- Preparation of MUAC Fallback FDPS-specific documentation.