Technical Migration Management Slovenia Control

Four years ago, APAC was contracted to perform the Technical Programme and Safety Management for Slovenia Control’s Migration to the new ATCC at airport Brnik with the task of renewing all the main ATC systems.
Now the migration enters a critical phase: the building is ready to start the installation of the technical infrastructure and the preparation for the operational switch-over in March 2012.